Submit for tests and inspections as specified in paragraph
entitled "Field Quality Control." Submit a detailed written
record of test conditions, test procedures, field data, and
startup and operational performance of entire heating plant to the
Contracting Officer before the Contractor's operational and test
personnel leave the site.
SD-07 Certificates
Compatibility of boiler components and equipment; G
System and equipment installation; G
Backflow preventer; G
specified under paragraph entitled "Experience Requirements,"
within 30 days after award and prior to commencing work on the
site.
Identical equipment; G
SD-10 Operation and Maintenance Data
Boiler, Data Package 3; G
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA. Include the following supplemental information
in addition to the requirements of Section 15050N BASIC MECHANICAL
MATERIALS AND METHODS.
a. Illustrations, catalog information, shop drawings, and
certified drawings of each item of equipment and control components
b. Tests and test results
c. Adjustments
d. Fan and blower characteristics curves
e. Pump characteristic curves
f. Boiler predicted performance data
g. List of special tools required
SECTION 15511N
Page 25