submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
Submittals required by this section require the approval of the Contracting
Officer. Within [60] [75] [90] days after award of the contract, shop
drawings accompanied with complete manufacturer's descriptive information
shall be submitted for approval as specified in Section 15050N BASIC
MECHANICAL MATERIALS AND METHODS. Drawing size shall be 841 by 594 mm 34 by
22 inches.
SD-02 Shop Drawings
Boiler; G
Burners; G
Dampers, stacks, and breechings; G
Fuel oil equipment; G
Piping and specialty items; G
Ball joint installation details; G
Reproducible drawings; G
SD-03 Product Data
Insulation types and installation procedures; G
SD-05 Design Data
Engineering Calculations; G
SD-06 Test Reports
Boiler predicted performance
Economizer performance
Variable speed motor controller; G
Submit certified copies of design, production and conformance
tests for approval before delivery of the equipment.
Hydrostatic and leak tightness tests; G
Preliminary operation; G
General startup requirements; G
Boilers and auxiliaries tests and inspections; G