of all tools, handling devices, and spare parts furnished.
1.4
WELDER QUALIFICATIONS
Welding shall be in accordance with qualifying procedures using performance
qualified welders and welding operators. Procedures and welders shall be
qualified in accordance with ASME BPVC SEC IX. Welding procedures
qualified by others, and welders and welding operators qualified by a
previously qualified employer may be accepted as permitted by ASME B31.1.
The Contracting Officer shall be notified 24 hr in advance of tests, and
the tests shall be performed at the work site, if practical. The welder or
welding operator shall apply his assigned symbol near each weld he makes as
a permanent record.[ Structural members shall be welded in accordance with
Section 05090A WELDING, STRUCTURAL.][ Welding and nondestructive testing
procedures shall be as specified in Section [[_____]][_____].]
1.5
REGULATORY REQUIREMENTS
Design, fabrication, and installation of the equipment shall conform to the
[specified] [applicable national, state, and local] codes. Documentation
for conformance shall be submitted according to paragraph SUBMITTALS.
1.6
DELIVERY, STORAGE, AND HANDLING
Material and equipment shall be protected from weather, humidity,
temperature variation, dirt, dust, and other contaminants during delivery
and storage. Lifting, moving, and storage of the engine shall be per
manufacturer's requirements.
1.7
PROJECT/SITE CONDITIONS
1.7.1
Site Environment Criteria
**************************************************************************
NOTE: The designer should specify the ambient
conditions where the engine drive will be installed.
Maximum and minimum air temperature is determined
by location. For indoor installation, use indoor
design maximum and minimum temperatures. For
outdoor installations use the 99-percentile
selection from ASHRAE Guide application tables for
the installation location.
**************************************************************************
Maximum Air Temperature
[_____] deg C F
Minimum Air Temperature
[_____] deg C F
Raw Water Temperature
Max.
[_____] deg C F
Min.
[_____] deg C F
Installation Elevation
[_____] m ft above sea level
1.7.2
Field Measurement
Before performing any work, the installation site shall be visited and all
details of the work verified. For new construction, plans and elevation
plans shall be reviewed for adequacy. The Contracting Officer shall be
notified in writing of any discrepancies.