undamaged condition. Handle and store materials to protect against damage
before and after delivery. [Prevent distortion of double-tongue switches
in transit and storage.]
1.5
EXISTING CONDITIONS
**************************************************************************
NOTE: An additional description of existing
conditions may be included in this paragraph. If
there is doubt as to foundation location, provide
for confirmation by the Contractor. A description
of any special conditions, such as any required
salvage or reuse of existing crane track components
or fittings, may be included in this paragraph.
**************************************************************************
**************************************************************************
NOTE: When existing crane rail trackage is to be
removed, use Section 02220, "Site Demolition" or the
EFD regional guide specification for removal work.
Provide specific requirements for removal of crane
rail trackage material. When existing materials are
to be reused, list materials here and indicate
determine the appropriateness of reusing existing
materials. When it is determined that existing
materials to be reused require reconditioning,
identify the materials and include reconditioning
requirements at the end of Part 2.
**************************************************************************
[Confirm existing rail, rail fittings, foundations, and utility locations
by means of a field survey.]
PART 2
PRODUCTS
2.1
RAIL MATERIALS
**************************************************************************
NOTE: When existing crane rail trackage is to be
removed, use Section 02220, "Site Demolition" or the
EFD regional guide specification for removal work.
Provide specific requirements for removal of crane
rail trackage material. When existing materials are
to be reused, list materials here and indicate
determine the appropriateness of reusing existing
materials. When it is determined that existing
materials to be reused require reconditioning,
identify the materials and include reconditioning
requirements at the end of Part 2.
**************************************************************************
Provide new track material [except for existing material approved for
reuse. Perform removal work as specified in Section 02220 DEMOLITION.
The
following material is existing and may be reused: [_____]].
SECTION 14606N
Page 9