Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
[The [_____] will review and] [_____] Division, Naval Facilities
Engineering Command will approve submittals requiring special review in
this section. Drawings and descriptive data shall be approved prior to
procurement, fabrication, and installation. A schedule of required
submittals shall be prepared to be integrated with the overall construction
management schedule to ensure adequate review and necessary corrective work
before installation.
SD-02 Shop Drawings
IDS components; G
Overall system schematic; G
SD-03 Product Data
Interior point sensors; G
Interior volumetric (space) sensors; G
Duress alarms; G
Keypad; G
Communication cables; G
[
[
Central station receiver/printer; G]
[Bell] [Siren]; G
Batteries; G
Cipher lock system; G
Tamper switches; G
Strobes; G
SD-06 Test Reports
IDS operational test; G
IDS final test; G
SD-07 Certificates