kg 75 pounds in weight and 0.113 cubic meter 4 cubic feet in
volume, moving through protected zones or portals at a velocity of
30 to 3050 mm per second 0.1 to 10 feet per second.
f.
Sensor zone: Geographic position for which an intrusion must be
identified and displayed and may be the combination of multiple
detection devices.
1.4
SYSTEM DESCRIPTION
(IDS), including associated equipment and appurtenances. Provision of IDS
shall include [supervising installation of rigid or flexible conduit for
IDS during site preparation,] running system wires and cables, and system
system shall be complete and ready for operation. Equipment, materials,
installation, workmanship, inspection, and testing shall be as specified
herein. [Existing system was manufactured by [_____], and new equipment
shall be compatible with and shall operate accurately and reliably with
existing system.] Include materials not furnished by the manufacturer with
IDS equipment as specified in Section 16402 INTERIOR DISTRIBUTION SYSTEM.
1.5
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************