work in accordance with 40 CFR 61-SUBPART M[ and 16 VAC 25-20-30]. Notify
the Contracting Officer and other appropriate Government agencies in
writing 20 working days prior to the start of asbestos work as indicated in
applicable laws, ordinances, criteria, rules, and regulations. Submit
copies of all Notifications to the Contracting Officer. [Notify the local
fire department 3 days prior to removing fire-proofing material from the
building including notice that the material contains asbestos.]
1.3.5
Environment, Safety and Health Compliance
**************************************************************************
NOTE: The designer shall research the State,
regional and local laws, regulations, statutes,
etc., and list by authority and document number in
the blank spaces provided those which apply to the
asbestos work to be performed by the Contractor.
**************************************************************************
In addition to detailed requirements of this specification, comply with
those applicable laws, ordinances, criteria, rules, and regulations of
Federal, State, regional, and local authorities regarding handling,
storing, transporting, and disposing of asbestos waste materials. Comply
with the applicable requirements of the current issue of 29 CFR 1926.1101,
40 CFR 61-SUBPART A, 40 CFR 61-SUBPART M, and ND OPNAVINST 5100.23. Submit
matters of interpretation of standards to the appropriate administrative
agency for resolution before starting the work. Where the requirements of
this specification, applicable laws, rules, criteria, ordinances,
regulations, and referenced documents vary, the most stringent requirement
as defined by the Government shall apply. The following laws, ordinances,
criteria, rules and regulations regarding removal, handling, storing,
transporting and disposing of asbestos materials apply:
a. [_____]
b. [_____]
c. [_____].
1.3.6
Respiratory Protection Program
Establish and implement a respirator program as required by ANSI Z88.2, 29
CFR 1926.1101, and 29 CFR 1926.103. Submit a written description of the
program to the Contracting Officer. Submit a written program manual or
operating procedure including methods of compliance with regulatory
statutes.
1.3.6.1
Respirator Program Records
Submit records of the respirator program as required by ANSI Z88.2, 29 CFR
1926.103, and 29 CFR 1926.1101.
1.3.7
Asbestos Hazard Control Supervisor
The Contractor shall be represented on site by a supervisor, trained using
the model Contractor accreditation plan as indicated in the Federal
statutes for all portions of the herein listed work.
SECTION 13281N