shall become the property of the Contractor and shall be disposed of as
specified and in accordance with applicable federal, state and local
regulations.
3.11.2
Collection and Disposal of Asbestos
**************************************************************************
NOTE: Consult 40 CFR 61, Subpart M, customer,
state, regional and local requirements.
**************************************************************************
All ACM waste shall be collected including contaminated wastewater filters,
scrap, debris, bags, containers, equipment, and asbestos contaminated
clothing and placed in leak-tight containers. Waste within the containers
shall be wetted in case the container is breeched. Asbestos-containing
waste shall be disposed of [at an EPA, state and local approved asbestos
impermeable containers shall be stored in an asbestos waste load-out unit
or in a storage/transportation conveyance (i.e., dumpster, roll-off waste
boxes, etc.) in a manner acceptable to and in an area assigned by the CO.
Procedure for hauling and disposal shall comply with 40 CFR 61, Subpart M,
state, regional, and local standards.
3.11.3
Scale Weight Measurement
**************************************************************************
NOTE: Remove this subparagraph when not required or
edit accordingly.
**************************************************************************
Scales used for measurement shall be public scales. Weighing shall be at a
point nearest the work at which a public scale is available. Scales shall
be standard truck scales of the beam type; scales shall be equipped with
the type registering beam and an "over and under" indicator; and shall be
capable of accommodating the entire vehicle. Scales shall be tested,
approved and sealed by an inspector of the State of [_____]. Scales shall
be calibrated and resealed as often as necessary and at least once every
three months to ensure continuous accuracy. Vehicles used for hauling ACM
shall be weighed empty daily at such time as directed and each vehicle
shall bear a plainly legible identification mark.
3.11.4
Weight Bills and Delivery Tickets
**************************************************************************
NOTE: Remove this subparagraph when not required or
edit accordingly.
**************************************************************************
Copies of weight bills and delivery tickets shall be submitted to the CO
during the progress of the work. The Contractor shall furnish the CO scale
tickets for each load of ACM weighed and certified. These tickets shall
include tare weight; identification mark for each vehicle weighed; and
date, time and location of loading and unloading. Tickets shall be
furnished at the point and time individual trucks arrive at the worksite.
A master log of all vehicle loading shall be furnished for each day of
loading operations. Before the final statement is allowed, the Contractor
shall file with the Contracting Officer certified weigh bills and/or
certified tickets and manifests of all ACM actually disposed by the
Contractor for this contract.
SECTION 13280A
Page 53