3.11.5
Records and Management Plan
3.11.5.1
Asbestos Waste Shipment Records
The Contractor shall complete and provide the CO final completed copies of
the Waste Shipment Record for all shipments of waste material as specified
in 40 CFR 61, Subpart M and other required state waste manifest shipment
records, within 3 days of delivery to the landfill. Each Waste Shipment
Record shall be signed and dated by the [Contractor] [CO], the waste
transporter and disposal facility operator.
3.11.5.2
Asbestos Management Plan
The Contractor shall provide a summary, in electronic form, of site
activities (bulk samples, asbestos removed, repaired, encased, etc.) for
updating the installation Asbestos Management Plan.
SECTION 13280A
Page 54