Calculations[; G][; G, [_____]]
a. Headloss calculations through the process units at the
design flow rate, including headloss calculations for associated
b.
Oxidant demand and subsequent AOP unit sizing.
c.
Electrical usage rate.
d.
Removal performance and material mass balance.
e.
Chemical feed requirements and equipment sizing.
f.
Diffuser system layout, mass transfer calculations.
Commissioning/Demonstration Plan[; G][; G, [_____]]
The Contractor shall submit a plan detailing the sampling
locations, frequency, analytical protocols, and duration which
will ensure the equipment complies with the standards indicated.
The plan shall be submitted to the contracting officer [_____]
[30] days prior to equipment start up. The Contractor shall
coordinate work within this section with other sections to ensure
upstream and downstream unit processes are complete and
a. Headloss calculations through the process units at the
design flow rate, including headloss calculations for associated
b.
Oxidant demand and subsequent AOP unit sizing.
c.
Electrical usage rate.
d.
Removal performance and material mass balance.
e.
Chemical feed requirements and equipment sizing.
f.
Diffuser system layout, mass transfer calculations.
The Contractor shall submit a plan detailing the sampling
locations, frequency, analytical protocols, and duration which
will ensure the equipment complies with the standards indicated.
The plan shall be submitted to the contracting officer [_____]
[30] days prior to equipment start up. The Contractor shall
coordinate work within this section with other sections to ensure
upstream and downstream unit processes are complete and
Manufactured Units
Wiring and control diagrams, systems layouts and isometrics,
component identification tables, instructions, and other sheets,
preventative maintenance procedures, methods of checking the
system for safe operation, making adjustments, and procedures for
safely starting and stopping the system shall be prepared in typed
SECTION 11377