considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Shop Drawings[; G][; G, [_____]]
AOP System[; G][; G, [_____]]
Air Preparation System[; G][; G, [_____]]
Oxygen Generation System[; G][; G, [_____]]
LOX Storage System[; G][; G, [_____]]
Ozone Generation System[; G][; G, [_____]]
Reactor Vessel[; G][; G, [_____]]
Metering Pump[; G][; G, [_____]]
Local Controls and Panels[; G][; G, [_____]]
Liquid Process Tank[; G][; G, [_____]]
Maintenance[; G][; G, [_____]]
Drawings showing shop and erection details and chemical
application locations; including cuts, codes, connections, holes,
and clearances for maintenance and operations.
SD-03 Product Data
AOP System[; G][; G, [_____]]
a. Manufacturer's descriptive and technical literature;
performance charts and curves, catalog cuts for specified
b. Materials of construction; inlet and outlet pipe sizes;
power demand requirements; and ozone generator cooling water flow
rate.
c. Spare parts data for each piece of equipment, current unit
prices and source of supply.
d. Manufacturer's descriptive and technical literature;
performance charts and curves, catalog cuts for specified
e. Materials of construction; inlet and outlet pipe sizes;
power demand requirements; and ozone generator cooling water flow
rate.
f. Spare parts data for each piece of equipment, current unit
prices and source of supply.