MSS SP-58
(2002) Pipe Hangers and Supports -
Materials, Design and Manufacture
MSS SP-69
(2002) Pipe Hangers and Supports -
Selection and Application
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250
(2003) Enclosures for Electrical Equipment
(1000 Volts Maximum)
NEMA ICS 6
(1993; R 2001) Industrial Control and
Systems: Enclosures
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 50
(2001) Bulk Oxygen Systems at Consumer
Sites
NFPA 70
(2005) National Electrical Code
1.2
MEASUREMENT AND PAYMENT
Measurement and payment requirements shall be as identified in the Payment
Schedule of the Bid Form.
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are