operations. Address work sequencing, surface preparation, coating
application, recoat and cure time projections, as well as how each step
will be controlled, tested, and evaluated. [Describe process of
determining the existing surface profile under paint, and procedures for
ensuring that the profile is not increased beyond the maximum profile
specified herein. ]Describe equipment and methods used to measure tank
temperatures and humidity. Provide detailed procedures, including
manufacturer's instructions, for repairing defects in the coating film such
as runs, drips, sags, holidays, overspray, etc. Address safety measures,
work scheduling based on expected weather condition extremes, and record
keeping.
1.4.3.2
Qualifications of Certified Industrial Hygienist (CIH)
Submit name, address, telephone number, FAX number, and e-mail address of
the independent third party CIH. Submit documentation that hygienist is
certified by the American Board of Industrial Hygiene in comprehensive
practice, including certification number and date of
certification/recertification. Provide evidence of experience with hazards
involved in industrial coating application work.
1.4.3.3
Qualifications of Testing Laboratory for Coatings
Submit name, address, telephone number, FAX number, and e-mail address of
the independent third party laboratory selected to perform testing of
coating samples for compliance with specification requirements. Submit
documentation that laboratory is regularly engaged in testing of paint
samples for conformance with specifications, and that employees performing
testing are qualified.
1.4.3.4
Qualifications of Testing Laboratory for Abrasive
Submit name, address, telephone number, FAX number, and e-mail address of
the independent third party laboratory selected to perform testing of
abrasive for compliance with specification requirements. Submit
documentation that laboratory has experience in testing samples of abrasive
for conformance with specifications, and that employees performing testing
are qualified.
1.4.3.5
Qualifications of Coating Contractors
**************************************************************************
NOTE: For projects in continental US, Hawaii,
Alaska, and Puerto Rico, coating contractor requires
SSPC Certification. Use in other locations where
qualified US contractor is desired. If project
involves removal of paint containing hazardous
materials, add requirement for SSPC QP-2
certification in section of specification where the
hazardous paint removal is specified, generally NFGS
13283.
**************************************************************************
**************************************************************************
NOTE:
**WARNING**WARNING**WARNING**WARNING**Solicitations
requiring SSPC Certification should point out the
existence and location of the certification
requirement on the PROJECT INFORMATION FORM. This
SECTION 09972
Page 11