For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-05, Design Data
SD-06 Test Reports
Coating Sample Test Reports; G, [_____]
Abrasive Sample Test Reports; G, [_____]
Daily Inspection Reports; G, [_____]
Recycled Metallic Abrasive Field Test Reports (Daily and Weekly);
G, [_____]
SD-07 Certificates
Work Plan; G, [_____]
Qualifications of Certified Industrial Hygienist (CIH); G, [_____]
Qualifications of Testing Laboratory for Coatings; G, [_____]
Qualifications of Testing Laboratory for Abrasive; G, [_____]
Qualifications of Coating Contractors; G, [_____]
[
Qualifications of Coating Manufacturer's Representative; G, [_____]
]
Roof Joint Sealant Materials; G, [_____]
Roof Joint Sealant Compatibility; G, [_____]