Epoxy Coating Materials; G, [_____]
Non-metallic Abrasive; G, [_____]
Metallic Abrasive; G, [_____]
SD-08 Manufacturer's Instructions
Roof Joint Sealant Instructions; G, [_____]
Coating System Instructions; G, [_____]
SD-11 Closeout Submittals
Disposal of Used Abrasive; G, [_____]
Inspection Logbook; G, [_____]
1.4
QUALITY ASSURANCE
1.4.1
Design Data
1.4.1.1
Environmental Control System
include ventilation, humidity control, and temperature regulation. Provide
calculations for humidity control during separate surface preparation and
coating application procedures, ventilation requirements during coating
application, and maximum allowable coating application rates to coincide
with ventilation. Include basis of design data on local conditions.
Provide equipment layout sketches and procedures showing function of each
piece of equipment and fail-safe measures. A Certified Industrial
Hygienist shall approve calculations, work procedures and personal
protective equipment.
1.4.2
Test Reports
1.4.2.1
Recycled Metallic Abrasive Field Test Reports (Daily and Weekly)
Submit test results from independent laboratory of daily and weekly Quality
Control testing required by SSPC AB 2, as modified in article entitled
"ABRASIVE."
1.4.3
Certificates
1.4.3.1
Work Plan
**************************************************************************
NOTE: For maintenance painting, add requirement for
pre-work determination of the existing surface
profile. If paint removal is specified in another
Section, such as a blast cleaning prior to
inspection or repair, or in the lead removal
Section, include this evaluation of existing profile
such that the paint removal operation does not
create excessive profile.
**************************************************************************
Submit a written plan describing in detail all phases of the coating
SECTION 09972
Page 10