Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Roofing panels; G
Submit drawings as necessary to supplement the instructions and
diagrams. Drawings shall include design and erection drawings
containing an isometric view of the roof showing the design uplift
pressures and dimensions of edge, ridge and corner zones. Show
typical and special conditions including flashings, accessory
installation, materials and thicknesses, all dimensions, anchoring
methods, sealant locations, sealant tape locations, fastener
layout, sizes, spacing, provisions for thermal movement,
terminations, penetrations, and attachments. Details of
installation shall be in accordance with the manufacturer's
Standard Instructions and details or the SMACNA Arch. Manual. The
manufacturer's technical engineering department shall approve the
drawings before they are submitted.
SD-03 Product Data
Roofing panels; G
Attachment clips
Closures
Accessories
Underlayment
Sample warranty certificate; G
Submit for all materials to be provided. Submit data sufficient
to indicate conformance to specified requirements.
SD-04 Samples
Roofing panels
Submit a 300 mm 12 inch long section of typical panel [in color
specified] [in color selected].
When colors are not indicated, submit samples of not less than
six different manufacturer's standard colors for selection.
Accessories
Submit each type of accessory item used in the project
including, but not limited to: each type of anchor clip,
closures, fasteners and leg clamps.