d.
Safety requirements.
The preroofing conference shall be attended by the Contractor and personnel
directly responsible for the roofing [and insulation] installation,
[mechanical] [and] [electrical work], and the roofing manufacturer's
technical representative. Conflicts among those attending the preroofing
conference shall be resolved and confirmed in writing before roofing work,
including associated work, is begun. [Prepare written minutes of the
preroofing conference and submit to the Contracting Officer.]
1.6.2
Manufacturer's Technical Representative
The representative shall have authorization from manufacturer to approve
field changes and be thoroughly familiar with the products and with
installations in the geographical area where construction will take place.
The manufacturer's representative shall be an employee of the manufacturer
with at least 5 years experience in installing the roof system. The
representative shall be available to perform field inspections and attend
meetings as required herein, and as requested by the Contracting Officer.
1.6.3
Qualification of Installer
The roofing system installer shall be factory-trained, approved by the
metal roofing system manufacturer to install the system, and shall have a
minimum of three years experience as an approved applicator with that
manufacturer. The applicator shall have applied five installations of
similar size and scope to this project within the previous 3 years.
1.6.4
Single Source
Provide roofing panels, clips, closures and other accessories from a single
manufacturer.
1.6.5
Manufacturer
The SSMRS shall be the product of a metal roofing industry recognized SSMRS
manufacturer who has been in the practice of manufacturing SSMRS for a
period of not less than 5 years and who has been involved in at least 5
projects similar in size and complexity to this project.
1.7
DELIVERY, STORAGE, AND HANDLING
Deliver, store, and handle preformed panels, bulk roofing products and
other manufactured items in a manner to prevent damage or deformation.
1.7.1
Delivery
Provide adequate packaging to protect materials during shipment. Do not
uncrate materials until ready for use except for inspection. Immediately
upon arrival of materials at jobsite, inspect materials for damage,
dampness, and staining. Replace damaged or permanently stained materials
that cannot be restored to like-new condition with new material. If
materials are wet, remove moisture, restack and protect panels until used.
1.7.2
Handling
Handle material carefully to avoid damage to surfaces, edges and ends.