sold on the site.
3.3.2
Reuse of Materials and Equipment
**************************************************************************
NOTE: Delete if inapplicable, or edit to suit
individual requirements. Items to be salvaged shall
be described in adequate detail to establish the
limits of the items involved. Requirements for
preparation and disposition will be as required to
meet job conditions.
**************************************************************************
Remove and store materials and equipment [listed [_____]] [indicated
[_____]] to be reused or relocated to prevent damage, and reinstall as the
work progresses.
3.3.3
Salvaged Materials and Equipment
**************************************************************************
NOTE: Delete if inapplicable, or edit to suit
individual requirements. Items to be salvaged shall
be described in adequate detail to establish the
limits of the items involved. Requirements for
preparation and disposition will be as required to
meet job conditions.
**************************************************************************
Remove materials and equipment that are [indicated [_____]] [and]
[specified [_____]] to be removed by the Contractor and that are to remain
the property of the Government, and deliver to a storage site [, as
directed within [_____] kilometers miles of the work site].
a.
Salvage items and material to the maximum extent possible.
b. Material salvaged for the Contractor shall be stored as approved by
before completion of the contract. Material salvaged for the
Contractor shall not be sold on the site.
c. Salvaged items to remain the property of the Government shall be
removed in a manner to prevent damage, and packed or crated to protect
the items from damage while in storage or during shipment. Items
damaged during removal or storage shall be repaired or replaced to
match existing items. Containers shall be properly identified as to
contents. The following items reserved as property of the Government
shall be delivered to the areas designated: [_____].
d. The following items reserved as property of the using service shall
be removed prior to commencement of work under this contract: [_____].
e. Historical items shall be removed in a manner to prevent damage.
The following historical items shall be delivered to the Government for
disposition: Corner stones, contents of corner stones, and document
boxes wherever located on the site.
**************************************************************************
NOTE: For Class I ODS materials, use the first
bracketed statement if the Contractor is to remove