the work, a comprehensive plan for tank removal and related operations. As
a minimum the plan shall include, but not be limited to, excavation,
removal, and ultimate disposal of the tank, its contents, and any
contaminated materials. The Work Plan shall be based on work experience,
on the requirements of this specification, and on the following references:
a.
API RP 1604.
b.
API Std 2015.
c.
API RP 2003.
d.
API PUBL 2217A.
e.
API PUBL 2219.
No work at the site, with the exception of site inspections and
mobilization, shall be performed until the Work Plan is approved.
At a
minimum, the Work Plan shall include:
a.
Discussion of the removal approach, tank cleaning, and tank
cutting procedures.
b.
A Sampling and Analysis Plan prepared in accordance with Section
01450A CHEMICAL DATA QUALITY CONTROL.
c.
Methods to be employed for product, sludge, vapor, and pumpable
liquid removal; purging and inerting; and storage methods proposed
for control of surface water.
d.
Treatment options.
e.
Identification of waste, tank and contaminated soil transporters
and means of transportation.
f.
Treatment, disposal, and alternate facilities, and means of
treatment, disposal or remediation.
g.
Borrow source.
h.
Spill prevention plan.
i.
Spill contingency plan.
j.
Decontamination procedures, shoring plan, and safety measures in
accordance with Section 01351 SAFETY, HEALTH, AND EMERGENCY
RESPONSE (HTRW/UST).
PART 2
PRODUCTS
2.1
**************************************************************************
NOTE: Part or all of this paragraph may be deleted
if the subject is addressed in other sections.
Refer to EM 1110-3-178 for special compaction
requirements such as under pavements.
**************************************************************************
SECTION 02115A
Page 11