approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
Work Plan[; G][; G, [_____]]..
The Work Plan within [30] [_____] days after notice to proceed.
The Contractor shall allow [30] [_____] days in the schedule for
the Government's review and approval. No adjustment for time or
money will be made for resubmittals required as a result of
noncompliance.
Qualifications[; G][; G, [_____]].
A document indicating that the Contractor meets the specified
requirements.
Salvage Rights.
A record of the disposition of salvaged materials at the end of
the contract.
SD-06 Test Reports
Tank Contents Verification[; G][; G, [_____]].
Contaminated Water Disposal[; G][; G, [_____]].
Soil Examination, Testing, and Analysis[; G][; G, [_____]].
Reports including the chain-of-custody records.
Backfilling[; G][; G, [_____]].
Copies of all laboratory and field test reports.
Tank Closure Report.
[_____] copies of the report for each UST site opened, prepared
in a standard 3-ring binder, within 14 days of completing work at
each site. Each binder shall be labeled with contract number,
project name, location and tank number; each binder shall be
indexed. A copy of the report shall be furnished to the
Installation Environmental Coordinator.
1.4
QUALIFICATIONS
**************************************************************************
NOTE: Require certification for tank removals
whenever work will be performed under a jurisdiction
requiring certification.
The laboratory validation process for underground
storage tank projects is addressed in EM 1110-3-178,
Removal of Underground Storage Tanks, and EM
200-1-1, Validation of Analytical Chemistry
Laboratories, dated 1 July 1994. This information