renovation), but is to be procured by the Government
directly from a system Contractor and completely
separate from the facility construction project
contract, then include this paragraph.
**************************************************************************
a. Coordinate all efforts with those of related trades that have provided
the infrastructure and rough-in, as indicated below, in the facility
construction project to accommodate the installation of the system. In the
event of any conflicts, delayed or improper preparatory work by Others,
notify the Contracting Officer for resolution. The Contracting Officers=
decision shall be binding.
b. The infrastructure and rough-in provided by the facility construction
project are generically designed to accommodate the installation of typical
system available in the marketplace. This includes cable trays, conduits,
boxes, grounding system and buss bars, and all primary power wiring, as
indicated in the facility construction project contract documents.
c. If the provided NCTV System requires any infrastructure or rough-in, in
addition to or different from what has been provided as part of the
facility construction project contract, then the NCTV System Contractor
shall provide all such additional infrastructures and rough-in at no
additional cost to the Government.
d. Provide trim plates as required to adapt faceplates to the boxes
provided by the facility construction project at no additional cost to the
Government.
3.3.7
Infrastructure and Rough-in - Existing Facility
**************************************************************************
NOTE: If the NCTV System is to be procured by the
Government directly from a system Contractor for
installation as a replacement system in an existing
facility, and not associated in any way with a
facility construction project (new, addition or
renovation), then include this paragraph.
**************************************************************************
a. Installation of the NCTV System shall utilize existing [cable trays,]
conduits, boxes, grounding system and buss bars, and all primary power
wiring to the maximum extent possible, provided these items accommodate the
installation and operation of the system as specified in this Section.
b. If the provided NCTV System requires any infrastructure or rough-in
that is in addition to, or different from, available existing conditions,
then the NCTV System Contractor shall provide all such additional
infrastructures and rough-in at no additional cost to the Government. The
system Contractor shall be responsible for any costs associated with the
installation of these items by Others.
c. Provide trim plates as required to adapt faceplates to existing boxes
at no additional cost to the Government.
d. Completely remove and discard all existing system cabling that is not
being reused as part of the NCTV System being installed.
e.
Completely remove all existing system equipment that is not being
SECTION 16730A
Page 39