instructions manual shall be provided within 30 calendar days
following the manuals.
Three additional copies of the instructions manual within 30
calendar days following the approval of the manuals.
1.4
DELIVERY, STORAGE, AND HANDLING
Devices and equipment shall be visually inspected by the Contractor when
received and prior to acceptance from conveyance. Stored items shall be
protected from the environment in accordance with the manufacturer's
published instructions. Damaged items shall be replaced. Oil filled
transformers and switches shall be stored in accordance with the
manufacturer's requirements. Wood poles held in storage for more than 2
weeks shall be stored in accordance with ATIS O5.1. Handling of wood poles
shall be in accordance with ATIS O5.1, except that pointed tools capable of
producing indentations more than inch in depth shall not be used. Metal
poles shall be handled and stored in accordance with the manufacturer's
instructions.
1.5
EXTRA MATERIALS
One additional spare fuse or fuse element for each furnished fuse or fuse
element shall be delivered to the Contracting Officer when the electrical
system is accepted. Two complete sets of all special tools required for
maintenance shall be provided, complete with a suitable tool box. Special
tools are those that only the manufacturer provides, for special purposes
(to access compartments, or operate, adjust, or maintain special parts).
1.6
DRAWINGS
1.6.1
Detailed Drawings
The Contractor shall submit detailed drawings consisting of equipment
drawings, illustrations, schedules, instructions, diagrams and other
information necessary to define the installation and enable the Government
to check conformity with the requirements of the contract drawings.
Detailed drawings shall, as a minimum, include:
a.
b.
Poles.
c. Calculations for steel poles and power installed screw
foundations.
d.
Crossarms.
e.
f.
Automatic circuit reclosers.
g.
Pole top switches.
h.
Conductors.
i.
j.
Surge arresters.