Government will not be held responsible for any changes to
equipment, device settings, ratings, or additional labor for
installation of equipment or devices ordered and/or procured prior
to approval of the study.
Nameplates
Catalog cuts, brochures, circulars, specifications, product
data, and printed information in sufficient detail and scope to
verify compliance with the requirements of the contract documents.
Material and Equipment
A complete itemized listing of equipment and materials proposed
for incorporation into the work. Each entry shall include the
item number, the quantity of items proposed, and the name of the
manufacturer of the item.
General Installation Requirements
As a minimum, installation procedures for regulators,
transformers and reclosers. Procedures shall include diagrams,
instructions, and precautions required to install, adjust,
calibrate, and test the devices and equipment.
SD-06 Test Reports
Factory Tests
Certified factory test reports shall be submitted when the
required by standards listed in paragraph REFERENCES. Results of
factory tests performed shall be certified by the manufacturer, or
an approved testing laboratory, and submitted within 7 days
following successful completion of the tests specified in
applicable publications or in these specifications.
Field Testing
A proposed field test plan [20] [30] [_____] days prior to
testing the installed system. No field test shall be performed
until the test plan is approved. The test plan shall consist of
complete field test procedures including tests to be performed,
test equipment required, and tolerance limits.
Operating Tests[; G][; G, [_____]]
[Six] [_____] copies of the information described below in 215.9
by 279.4 mm (8-1/2 by 11 inch) 8-1/2 by 11 inch binders having a
minimum of 5 rings, and including a separate section for each
test. Sections shall be separated by heavy plastic dividers with
tabs.
a.
A list of
b.
A copy of
measurements taken.
c.
The dates of testing.