12.
13.
14.
Lube oil type
15.
Lube oil sump drain
16.
Lube-oil filter
17.
Lube-oil-level indicator
18.
Lube-oil-fill level
19.
All lube-oil line connections
20.
All lube-oil lines
21.
Fuel type and amount
22.
All fuel-line connections
23.
All fuel lines
24.
25.
Coupling and shaft alignment
26.
Voltage regulators
27.
Battery-charger connections
28.
All wiring connections
29.
30.
Hazards to personnel
31.
Base
32.
Nameplates
33.
Paint
34.
35.
Switchboard
36.
Switchgear
2.27.2
**************************************************************************
NOTE: For dual fuel units, choose the fuel type to
be used for the factory test. Decision should be
based on providing satisfactory operation with the
fuel which has the lowest heat value or on the fuel
which presents the factors critical to satisfactory
operation.
Delete Voltage Waveform tests for general purpose
and commercial application categories.
Delete the Frequency and Voltage Stability and
Transient Response Test for general-purpose and
commercial-type applications. Perform this test
either as a factory test or a field test (delete it
from either the factory or field testing). This is
not a standard manufacturer's test and requires most
manufacturers to procure additional equipment (large
reactive load banks) to test gensets over 1000 kW.
Perform as a field test where required to ensure
system operability using project loads. Revise the
test steps to delete steps where the Maximum Step
Increase is larger than final load to be placed on
the genset.
Voltage Unbalance with Unbalanced Load Test is not a
standard manufacturer's test. Delete the test for
applications where only balanced three phase loads
are served.
Delete parallel operation where not required.
SECTION 16263A
Page 68