from no load to full load and the maximum vibration transmitted to
the floor. Description of seismic qualification of the
engine-generator mounting, base, and vibration isolation.
Posted Data and Instructions[; G][; G, [_____]]
Posted data including wiring and control diagrams showing the
key mechanical and electrical control elements, and a complete
layout of the entire system.
Instructions[; G][; G, [_____]]
Instructions including: the manufacturers pre-start checklist
and precautions; startup procedures for test-mode, manual-start
mode, and automatic-start mode (as applicable); running checks,
procedures, and precautions; and shutdown procedures, checks, and
precautions. Instructions shall include procedures for
interrelated equipment (such as heat recovery systems,
co-generation, load-shedding, and automatic transfer switches).
Instructions shall be weatherproof, laminated in plastic, and
posted where directed.
Experience
Statement showing that each component manufacturer has a minimum
of 3 years experience in the manufacture, assembly and sale of
components used with stationary diesel engine-generator sets for
commercial and industrial use. The engine-generator set
manufacturer/assembler has a minimum of 3 years experience in the
manufacture, assembly and sale of stationary diesel
engine-generator sets for commercial and industrial use.
Field Engineer
A letter listing the qualifications, schools, formal training,
and experience of the field engineer.
General Installation
A copy of the manufacturer's installation procedures and a
detailed description of the manufacturer's recommended break-in
procedure.
SD-06 Test Reports
Factory Inspection and Tests
[Six] [_____] complete reproducible copies of the factory
inspection result on the checklist format specified in paragraph
FACTORY INSPECTION AND TESTS.
a. A letter giving notice of the proposed dates of factory
inspections and tests at least 14 days prior to beginning tests.
b. A detailed description of the manufacturer's procedures for
factory tests at least [14] [_____] days prior to beginning tests.