For Chiller:
[_____]
Checklist Item
Q
M
E
T
C
D
O
U
Installation
a.
Chiller properly piped.
___ ___
X
___ ___ ___ ___ ___
b.
Chilled water pipe leak tested.
___ ___
X
X
X
___ ___ ___
c.
Verify that refrigerant used complies
with specified requirements.
___ ___
X
X
X
___ ___ ___
d.
Any damage to coil fins has been repaired.__ ___
X
___
X
___ ___ ___
e.
Manufacturer's required maintenance
clearance provided.
___ ___
X
X
X
___ ___ ___
Electrical
a.
Power available to unit disconnect.
___ ___ ___
X
___ ___ ___ ___
b.
Power available to unit control panel.
___ ___ ___
X
___ ___ ___ ___
c.
Separate power is supplied to electric
___ ___ ___
X
___ ___ ___ ___
d.
Verify that power disconnect is located
within sight of the unit it controls.
___ ___ ___
X
___ ___ ___ ___
Controls
a.
Factory startup and checkout complete.
___ ___
X
X
___ ___ ___ ___
b.
X
X
___ ___ ___ ___
c.
Chilled water flow switch installed.
___ ___
X
X
___ ___ ___ ___
d.
Chilled water flow switch tested.
___ ___
X
X
___ ___ ___ ___
e.
Chilled water pump interlock installed.
___ ___
X
X
X
___ ___ ___
f.
Chilled water pump interlock tested.
___ ___ ___
X
___ ___ ___ ___
SECTION 15995A
Page 16