For VAV Terminal:
[_____]
Checklist Item
Q
M
E
T
C
D
O
U
Installation
a.
VAV terminal in place.
___ ___
X
X
X
___ ___ ___
b.
VAV terminal ducted.
___ ___
X
X
X
___ ___ ___
c.
VAV terminal connected to controls.
___ ___
X
X
___ ___ ___ ___
[d.
Reheat coil connected to hot water pipe.___ ___
X
___
X
___ ___ ___]
[e.
Electric reheat coil connected to local
disconnect.
___ ___ ___ ___
X
___ ___ ___]
f.
Manufacturer's required maintenance
clearance provided.
___ ___
X
X
X
___ ___ ___
Controls
a.
Cooling only VAV terminal controls set.
___ ___
X
X
___ ___ ___ ___
b.
Cooling only VAV controls verified.
___ ___
X
X
___ ___ ___ ___
c.
Reheat VAV terminal controls set.
___ ___
X
X
___ ___ ___ ___
d.
Reheat terminal/coil controls verified.
___ ___
X
X
___ ___ ___ ___
Testing, Adjusting, and Balancing (TAB)
a.
Verify terminal maximum air flow set.
___ ___
X
___ ___ ___ ___ ___
b.
Verify terminal
minimum air flow set.
___ ___
X
___ ___ ___ ___ ___
c.
TAB operation complete.
___ ___
X
___
X
___ ___ ___
SECTION 15995A
Page 13