For Chiller:
[_____]
Checklist Item
Q
M
E
T
C
D
O
U
Installation
a.
Chilled water connections properly piped.___ ___
X
___ ___ ___ ___ ___
___ ___
X
___ ___ ___ ___ ___
piped
c. Chilled water pipe leak tested.
___ ___
X
X
X
___ ___ ___
d.
Condenser water pipe leak tested.
___ ___
X
X
X
___ ___ ___
e.
High efficiency purge unit installed
and operating as specified.
___ ___
X
X
X
___ ___ ___
f.
Refrigerant leak detector installed.
___ ___ ___ ___ ___ ___ ___ ___
g.
Oxygen sensor installed and tested.
___ ___ ___ ___ ___ ___ ___ ___
h.
Mechanical room ventilation installed as
specified.
___ ___ ___ ___ ___ ___ ___ ___
i.
Manufacturer's required maintenance
___ ___
X
X
___ ___ ___ ___
clearance provided.
j.
meet manufacturer's prescribed tolerances.__ ___
X
X
X
___ ___ ___
Electrical
a.
Power available to unit starter.
___ ___ ___
X
___ ___ ___ ___
b.
Power available to unit control panel.
___ ___ ___
X
___ ___ ___ ___
c.
Verify that power disconnect is located
within sight of the unit it controls.
___ ___ ___
X
___ ___ ___ ___
Controls
a.
Factory startup and checkout complete.
___ ___
X
X
___ ___ ___ ___
b.
X
___ ___ ___ ___
c.
Chilled water flow switch installed.
___ ___
X
X
___ ___ ___ ___
d.
Chilled water flow switch tested.
___ ___
X
X
___ ___ ___ ___
e.
Chilled water pump interlock installed.
___ ___ ___
X
___ ___ ___ ___
f.
Chilled water pump interlock tested.
___ ___ ___
X
___ ___ ___ ___
g.
___ ___
X
___ ___ ___ ___ ___
h.
Condenser water flow switch tested.
___ ___ ___
X
___ ___ ___ ___