[Three] [_____] copies of the completed Final Acceptance Tests
Reports, no later that [7] [_____] days after the completion of
the Final Acceptance Tests. All items in the Final Acceptance
Report shall be signed by the Exhaust System Specialist.
SD-07 Certificates
Inspection by Exhaust System Specialist[; G][; G, [_____]]
Concurrent with the Final Acceptance Test Report, certification
by the Exhaust System Specialist that the exhaust system is
installed in accordance with the contract requirements, including
signed approval of the Final Acceptance Test Reports.
SD-10 Operation and Maintenance Data
Exhaust System
[Six] [_____] manuals listing step-by-step procedures required
for system startup, operation, shutdown, and routine maintenance,
at least 14 days [_____] prior to on-site training. The manuals
shall include the manufacturer's name, model number, parts list,
list of parts and tools that should be kept in stock by the owner
for routine maintenance including the name of a local supplier,
simplified wiring and controls diagrams, troubleshooting guide,
and recommended service organization (including address and
telephone number) for each item of equipment. [Each service
organization submitted shall be capable of providing [4] [_____]
hour on-site response to a service call on an emergency basis.]
1.6
JOB REQUIREMENTS
The Contractor shall construct, complete and operational,exhaust system(s)
as specified herein. The exhaust system(s) shall provide adequate air
exhaust quantities and velocities. All duct shall be properly sized for
pressure loss and adequate velocity including locating intakes, ductwork
size, layout, equipment and controls. Construction of the exhaust system
shall be based on the referenced publications, and other provisions as
specified herein.
1.6.1
Detail Drawings
The Contractor shall submit Detail Drawings consisting of a complete list
of equipment and materials, including manufacturer's descriptive and
technical literature, performance charts and curves, catalog cuts, and
that the system has been coordinated and will properly function as a unit.
Drawings shall show proposed layout and anchorage of equipment and
appurtenances, and equipment in relation to other parts of the work
including clearances required for maintenance and operation.
1.6.2
Spare Parts
The Contractor shall submit spare parts data for each item of equipment and
material specified. The data shall include a complete list of parts and
supplies, with current unit prices and source of supply, and a list of