[7] [_____] days after the approval of the Exhaust System
Specialist.
Ductwork Components[; G][; G, [_____]]
Materials and Equipment
Manufacturer's catalog data included with the Exhaust System
Drawings for all items specified herein. The data shall be
highlighted to show model, size, options, etc., that are intended
for consideration. Data shall be adequate to demonstrate
compliance with all contract requirements. In addition, a complete
and quantity shall be provided.
Spare Parts
Spare parts data for each different item of material and
equipment specified.
Field Instructions
Final Acceptance Tests
Proposed diagrams, instructions, and other sheets, concurrent
with the Final Acceptance Test Procedures, Framed instructions
under glass or in laminated plastic shall be posted where
directed, including wiring and control diagrams showing the
complete layout of the entire system. Condensed operating
of checking the system for normal safe operation, and procedures
for safely starting and stopping the system shall be prepared in
typed form, framed as specified above for the wiring and control
diagrams and posted beside the diagrams. The framed instructions
shall be posted before acceptance testing of the systems.
Proposed procedures for Final Acceptance Tests, no later than
[14] [_____] days prior to the proposed start of the tests.
Proposed date and time to begin Final Acceptance Tests,
submitted with the Final Acceptance Test Procedures. Notification
shall be provided at least [14] [_____] days prior to the proposed
start of the test.
On-site Training[; G][; G, [_____]]
Proposed On-site Training schedule, at least [14] [_____] days
Exhaust System Specialist[; G][; G, [_____]]
The name and documentation of certification of the proposed
Exhaust System Specialists, no later than 14 days [_____] after
the Notice to Proceed and prior to the submittal of the exhaust
system drawings and hydraulic calculations.
SD-06 Test Reports
Final Acceptance Tests
SECTION 15940A
Page 7