Spray dryer sulfur dioxide absorbers
Control panels
Monorail and hoist
Rubber hose and rubber-lined pipe
SD-05 Design Data
Equipment foundation design loading requirements
Hangar load calculations
Guillotine dampers design pressures and flows
SD-06 Test Reports
Lime system component equipment
Atomizers
Piping
Pump tests
Bag material
Fans
Motors
Damper tests
Mechanical draft equipment
Smoke tests
System stoichiometry tests
System power consumption tests
Include field data sheets and show the calculation of
stoichiometry with stoichiometry field test report. Include an
explanation of the method used for the system power consumption
determination.