1.5.6
Tabulations
Submit a tabulation of piping connections with each assigned a unique
designation including size and type of each connection in all views. Submit
a tabulation of valves furnished, with each assigned a unique designation
including manufacturer, pressure and temperature rating, body material,
trim material, and manufacturer's model or figure number, and a detailed
cross section of each different model or figure number, and valve. Submit a
tabulation of instruments and instrument connections furnished in spray
dryer sulfur dioxide absorbers, fabric filter baghouse, ductwork, and
type, location, and quantity for each connection.
1.6
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 15864N
Page 20