three-valved, except a five-valve manifold shall be used when the meter is
sealed or purged.
3.2
TESTING
3.2.1
General
Before requesting the performance and acceptance test, final checking of
systems installations and preliminary operation testing and adjustments of
all systems shall be conducted in accordance with the manufacturer's
recommendations and the requirements of the specifications. All tests
shall be scheduled in advance and conducted at times approved. Testing
shall be performed in the presence of the Contracting Officer.
3.2.1.1
Schedule for Testing
The Contractor shall notify the Contracting Officer in writing at least
[20] [_____] days in advance of the intent to test the boilers, and a
testing schedule shall be submitted. The Contracting Officer will notify
the appropriate authorities.
3.2.1.2
Visual Inspection
Each boiler shall be examined for defects outlined below:
a.
Parts of components missing.
b.
Improper assembly.
c.
Parts or components not functioning properly.
d.
Workmanship not as specified.
e.
Exposed edges of metal not smooth.
f.
Materials not as specified.
3.2.1.3
Repairs
All defective parts furnished and installed by the Contractor shall be
replaced and all repairs identified during capacity and operating tests
shall be completed.
3.2.2
All instrument systems shall be tested after completing the following
activities:
a.
Inspect complete work and make any nonoperating checks required to
assure operability in the manner required for the process
application.
b.
Check instrument air lines and wiring for proper hookup.
c.
Test air lines for tightness according to the requirement of the
Instrument Society of America Recommended Practice ISA S7.0.01.
d.
Commission instruments, controls, interlocks, alarms, and related
items. Include operating checks, provision and installation of