Equipment[; G][; G, [_____]]
for the following items. The data shall be highlighted to show
model, size, options, etc., that are intended for consideration.
Data shall be adequate to demonstrate compliance with contract
requirements for the following:
a.
Evaporative coolers
b.
Air washers
c.
Water tanks
d.
Thermostats
Test Procedures[; G][; G, [_____]]
Proposed test procedures for performance tests of systems, at
least 2 weeks prior to the start of related testing.
Installation[; G][; G, [_____]]
Proposed diagrams, at least 2 weeks prior to start of related
testing. System diagrams that show the layout of equipment,
piping, and ductwork, and typed condensed operation manuals
explaining preventative maintenance procedures, methods of
checking the system for normal, safe operation, and procedures for
safely starting and stopping the system shall be framed under
glass or laminated plastic. After approval, these items shall be
posted where directed.
Manufacturer's Representative[; G][; G, [_____]]
A letter, at least 2 weeks prior to the start of work, listing
the experience and training of the Manufacturer's Representative.
Service Organization[; G][; G, [_____]]
A letter, at least 2 weeks prior to the start of work, listing
the experience and training of the Service Organization.
Performance Tests[; G][; G, [_____]]
Proposed test schedules for performance tests, at least 2 weeks
prior to the start of related testing.
Training Course[; G][; G, [_____]]
Proposed schedule for field training submitted at least 2 weeks
SD-06 Test Reports
Testing, Adjusting, and Balancing[; G][; G, [_____]]
Test reports for the performance tests in booklet form, upon
completion of testing. Reports shall document all phases of tests
performed including initial test summary, all repairs/adjustments
SECTION 15690A
Page 7