Operation and Maintenance Instructions[; G][; G, [_____]]
[Six] [_____] complete copies of operation manual outlining the
step-by-step procedures required for system startup, operation and
shutdown. The manuals shall include the manufacturer's name,
and their basic operating features. [Six] [_____] complete copies
of maintenance manual listing routine maintenance procedures,
possible breakdowns and repairs, preventative maintenance
schedule, and troubleshooting guides. The manuals shall include
piping layout, equipment layout, and simplified wiring and control
diagrams of the system as installed. The manuals shall also
include equipment lubrication requirements and schedules,
recommended spare parts list, index, instruction book binders with
hard back covers and printing to identify the name of the
facility, Government entity operating the facility, Contractor,
shop order, equipment, and volume number if required. Operation
course.
1.3
GENERAL REQUIREMENTS
1.3.1
Standard Products
Material and equipment shall be the standard products of a manufacturer
regularly engaged in the manufacture of such products and shall essentially
duplicate items that have been in satisfactory use for at least 2 years
prior to bid opening. Equipment shall be supported by a service
organization that is, in the opinion of the Contracting Officer, reasonably
convenient to the site.
1.3.2
Nameplates
Each major item of equipment shall have the manufacturer's name, address,
type or style, model or serial number, and catalog number on a plate
secured to the item of equipment.
1.3.3
Equipment Guards and Access
Belts, pulleys, chains, gears, couplings, projecting setscrews, keys, and
other rotating parts exposed to personal contact shall be fully enclosed or
guarded. High temperature equipment and piping exposed to contact by
personnel or where they create a fire hazard shall be properly guarded or
covered with insulation of the type specified. Items such as catwalks,
operating platforms, ladders, and guardrails shall be provided where shown
and shall be constructed in accordance with Section 05500A MISCELLANEOUS
METAL.
1.3.4
Field Measurements
The Contractor shall become familiar with all details of the work, verify
all dimensions in the field, and shall advise the Contracting Officer of
any discrepancy before performing the work.
1.3.5
Welding
**************************************************************************
NOTE: If the need exists for more stringent
requirements for weldments, delete the first
SECTION 15561A
Page 17