Capacity
Discharge Head
[_____] gpm
[_____] feet
b.
Condensate pump service requirements
(1)
Capacity:
[_____] L/s gpm
(2)
Pumping temperature range:
[_____ to _____] degrees C F
(3)
Liquid pH:
[_____]
(4)
Discharge head:
[_____] kPa feet
(5)
Available NPSH:
[_____] kPa feet
(6) In addition to the operating point established above, the
pump curve shall run through the following points:
Capacity
Discharge Head
[_____] L/s
[_____] kPa
[_____] L/s
[_____] kPa
Capacity
Discharge Head
[_____] gpm
[_____] feet
[_____] gpm
[_____] feet
1.5
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
SECTION 15502N