1.4.2.7
Include the following:
a.
Certified outline and general arrangement drawings for complete
coal handling system
b.
Dimensional equipment and fabrication drawings, including all
equipment weights, equipment locations, support details, and
anchor bolt arrangements for items and equipment specified under
the coal handling section
c.
Control panel, coal presence indicators, and equipment response
switch details
d.
1.4.2.8
Fuel Oil Equipment
Drawings may be manufacturer's standard size for pumps, pump curves,
valves, strainers and pump wiring.
a.
Certified outline and general arrangement drawings
b.
Certified pump and performance curves and tabulations
c.
Equipment detail sheets including viscosity controller, heater and
valves
d.
e.
Oil tanks, foundations, tank heaters, appurtenances, water
draw-off and level indication.
1.4.2.9
Piping and Specialty Items
Drawings may be manufacturer's standard size.
a.
Details of valves and special fittings
b.
Feedwater regulator details and schematics
c.
Details and schematics of feedwater automatic recirculation
1.4.2.10
Flexible Ball Expansion Joint Installation Details
Include allowable angular flex and minimum offset dimensions for approval.
1.4.2.11
Reinforced Concrete Foundation
Concrete and reinforcing for the foundation shall be detailed on the
Contractor's submitted shop drawings as specified under Section 03300N
CAST-IN-PLACE CONCRETE.
1.4.2.12
Reproducible Drawings
Submit one reproducible plastic shop drawing of each approved drawing sheet
to the Contracting Officer for the following items:
SECTION 15502N
Page 39