a.
Boiler layout, foundations, construction and details including
[preheaters,] [economizers,] auxiliaries and details
b.
Breeching layout, construction and details
c.
Burner construction, control and flame safety schematics, and
details
d.
Burner details
e.
f.
Fuel tanks, foundations and appurtenances
g.
Feedwater automatic recirculation system
h.
Piping schematics
i.
Control diagrams schematics including panel construction and layout
j.
k.
Stoker drawings and details
l.
Ash handling system, including panels, schematics and details
1.4.3
Test Reports
1.4.3.1
Boiler Predicted Performance Data
Submit certified copies of design, production and conformance tests for
approval before delivery of the equipment.
1.4.3.2
Fan Performance Data
Submit to the Contracting Officer manufacturer's fan performance data based
on performance tests made in accordance with the requirements of AMCA 210.
AMCA certified test data from prototype fan designs is acceptable.
1.4.4
Performance Requirements
1.4.4.1
Boiler
**************************************************************************
NOTE: The specified efficiency for the boiler at
maximum continuous load shall be not less than 80
percent for coal and 82 percent for oil. When an
economizer is provided, use 82 and 84 percent
respectively for coal and oil firing. Depending on
the particular application and fuel used, these
efficiencies could be higher.
**************************************************************************
The efficiency listed for coal burning shall be based on stoker firing with
[_____] percent excess air. [The efficiency for fuel oil firing shall be
based on [_____] percent excess air]. The efficiency shall allow for
[_____] percent continuous blowdown and 1.5 percent unaccounted losses and
manufacturer's margin. Base the performance on the boiler burning fuels in
accordance with the Coal Analysis [Fuel Oil Analysis] listed below.
SECTION 15502N
Page 40