1.6.6.2
Proof of Experience
Submit proof of experience of manufacturers, system suppliers and
installers as follows:
a.
Experience, Responsibility and Certification: Submit to the
certificates within 30 days after award and prior to commencing
work on the site.
**************************************************************************
NOTE: Verify number of manufacturers' installations
operating and years of operation for coal handling
avoid an unnecessarily restrictive experience
requirement.
**************************************************************************
b.
Experience Requirements: Boilers and equipment installed within
or as a part of the heating plant shall be of proven designs.
Each manufacturer or system supplier shall be regularly engaged in
designing, fabricating, erecting or erection supervision, testing
and starting up of the equipment or system. Within 30 days after
award or at any time during performance of the contract, when the
Contractor is required to use another manufacturer or system
supplier is required through no fault of the Contractor, the
Contractor shall submit a certificate and other evidence from each
manufacturer or each system supplier to show that equipment and
systems, made or furnished by the manufacturers or system
suppliers, have substantially comparable operating requirements to
the equipment or systems specified under this section and that
they have been successfully installed and reliably operated in at
least [one] [two] [three] installations under substantially
comparable operating conditions for a period of not less than two
years.
c.
or proof of experience required from the equipment manufacturer or
system supplier containing the following information:
(1) List of installations meeting the aforementioned requirements
(2)
Owner and location of each installation.
(3) Name and phone number of supervisory person at each
installation.
(4)
Date of Owner acceptance of such installation.
d.
Vertical Fuel Oil Tank Calibration Experience: Submit to the
Contracting Officer evidence or proof that the tank calibration
organization has at least 2 years of prior successful and accurate
experience in calibrating tanks of comparable type and size.
1.6.6.3
System and Equipment Installation
Submit from each system supplier and each manufacturer of the equipment,
written certification that the system and equipment installation is in
accordance with the system supplier's and equipment manufacturer's