CONVEYOR NO. 1
CONVEYOR NO. 2
a.
Capacity
[_____] tons/hr
[_____] tons/hr
b.
Screw diameter
[_____] inches
[_____] inches
c.
Length
[_____] feet
[_____] feet
d.
Coupling diameter
[_____] inches
[_____] inches
e.
[_____] hp
[_____] hp
f.
Screw flight thickness
[_____] inches
[_____] inches
g.
Trough thickness
[_____] inches
[_____] inches
h.
Trough cover thickness
[_____] inches
[_____] inches
i.
Trough end plate thickness
[_____] inches
[_____] inches
j.
Maximum speed
[_____] rpm
[_____] rpm
1.4.1.6
Screw Conveyors for Ash Handling Systems (Mechanical)
Each screw conveyor shall meet the following minimum design and performance
specifications when handling dry fly ash of density not greater than [_____]
kg per cubic meter pounds per cubic foot:
CONVEYOR NO. 1
CONVEYOR NO. 2
a.
Capacity
[_____] Mg/hr
[_____] Mg/hr
b.
Screw diameter
[_____] mm
[_____] mm
c.
Length
[_____] meters
[_____] meters
d.
Coupling diameter
[_____] mm
[_____] mm
e.
Motor power
[_____] kW
[_____] kW
f.
Screw flight thickness
[_____] mm
[_____] mm
g.
Trough thickness
[_____] mm
[_____] mm
h.
Trough cover thickness
[_____] mm
[_____] mm
i.
Trough end plate thickness
[_____] mm
[_____] mm
j.
Maximum speed
[_____] rpm
[_____] rpm
CONVEYOR NO. 1
CONVEYOR NO. 2
a.
Capacity
[_____] tons/hr
[_____] tons/hr
b.
Screw diameter
[_____] inches
[_____] inches
c.
Length
[_____] feet
[_____] feet
SECTION 15502N
Page 26