factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Drawings[; G][; G, [_____]]
Drawings, at least [5 weeks] [_____] prior to beginning
construction, providing adequate detail to demonstrate compliance
with contract requirements.
SD-03 Product Data
Verification of Dimensions
A letter, at least 2 weeks prior to beginning construction,
indicating the date the site was visited, confirming existing
conditions, and noting any discrepancies found.
Standard Products[; G][; G, [_____]]
Manufacturer's catalog data, at least [5 weeks] [_____] prior to
beginning construction, highlighted to show model number, size,
options, performance charts and curves, etc., in adequate detail