Submit data on proposed equipment, including, but not limited to
the items listed above. Include UL or FM listing cards for
equipment provided.
SD-06 Test Reports
Furnish preliminary test results to the Contracting Officer.
Include the control panel and initiating and indicating devices, a
unique identifier for each device with an indication of test
results, and signature of the factory-trained technician of the
control panel manufacturer and equipment installer. With reports
on preliminary tests, include printer information.
SD-07 Certificates
Qualifications of installer
SD-10 Operation and Maintenance Data
INTERIOR FIRE ALARM SYSTEM, Data Package [5] [_____]; G
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
Record drawing software
SD-11 Closeout Submittals
Prepare and submit to the Contracting Officer six sets of
detailed as-built drawings. The drawings shall include complete
both factory and field wired. Include a riser diagram and drawings
showing the as-built location of devices and equipment. The
drawings shall show the system as installed, including deviations
The drawings shall be prepared on uniform sized mylar sheets not
less than 760 by 1065 mm with 200 by 100 mm 30 by 42 inches with 8
by 4 inch title block similar to contract drawings. These
drawings shall be submitted within 2 weeks after the final
acceptance test of the system. At least one set of as-built
(marked-up) drawings shall be provided at the time of, or prior to
the final acceptance test.
Submit the installer's training history for the employees
involved with this contract.
1.5
ADDITIONAL SUBMITTAL REQUIREMENTS
1.5.1
Battery Power Calculations
Verify that battery capacity exceeds supervisory and alarm power
requirements.
a.
Provide complete battery calculations for both the alarm and
system component shall be submitted with the calculations.
b.
Provide data on each circuit to indicate that there is at least 25
percent spare capacity for notification appliances, [25] [50]
SECTION 13855N
Page 9