Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
Provide six complete sets of submittals. Partial submittals will not be
acceptable and will be returned without review. [The [_____] Division]
[Engineering Field Activity (EFA) [_____]], Naval Facilities Engineering
Command, Fire Protection Engineer, will review and approve submittals.
SD-02 Shop Drawings
**************************************************************************
NOTE: Provide 25 percent spare capacity where
buildings are presently sprinkler protected
throughout or where such protection is being
provided under this design. Where automatic
sprinkler protection will be provided later, use 50
percent spare capacity.
**************************************************************************
connection and terminals used for electrical field connections in
systems which are supervised or controlled by the system.
Diagrams shall show connections from field devices to the FACP and
Provide plan view drawing showing device locations, terminal
cabinet locations, junction boxes, other related equipment,
conduit routing, wire counts, circuit identification in each
conduit, and circuit layouts for all floors.
Provide a complete description of the system operation [in
matrix format] on the drawings.
Provide a complete list of device addresses and corresponding
messages.
Provide detailed drawings of the graphic annunciator.
Include annotated catalog data, in table format on the drawings,
showing manufacturer's name, model, voltage, and catalog numbers
for equipment and components.
Provide complete riser diagrams indicating the wiring sequence
of devices and their connections to the control equipment.
Include a color code schedule for the wiring. Include floor plans
showing the locations of devices and equipment.