Data lists of spare parts, tools, and test equipment for each
different item of material and equipment specified.
Manufacturer's Instructions[; G][; G, [_____]]
Printed copies of manufacturer's recommendations for
installation of materials prior to installation. Where
installation procedures, or any part thereof, are required to be
in accordance with manufacturer's recommendations, installation of
the item will not be allowed to proceed until the recommendations
are received and approved.
Testing[; G][; G, [_____]]
Test plan defining all tests required to ensure that the system
meets technical, operational and performance specifications, [60]
[_____] days prior to proposed test date. The test plan must be
approved before the start of any testing. The test plan shall
identify the capabilities and functions to be tested, and include
detailed instructions for the setup and execution of each test and
procedures for evaluation and documentation of the results.
Experience
Written proof of specified experience requirements.
SD-06 Test Reports
Performance Verification Test
Test reports, in booklet form with witness signatures verifying
execution of tests. Reports shall show the field tests to verify
compliance with the specified performance criteria. Test reports
shall include records of the physical parameters verified during
testing. Test reports shall be submitted within [7] [14] [_____]
days after completion of testing.
Materials and Equipment
Where materials or equipment are specified to conform, be
constructed or tested to meet specific requirements, certification
that the items provided conform to such requirements.
Certification by a nationally recognized testing laboratory that a
representative sample has been tested to meet the requirements, or
a published catalog specification statement to the effect that the
item meets the referenced standard, will be acceptable as evidence
that the item conforms. Compliance with these requirements does
not relieve the Contractor from compliance with other requirements
of the specifications.
1.3
SYSTEM DESCRIPTION
1.3.1
General
The Contractor shall configure the Intrusion Detection System (IDS) as
described and shown, including Government Furnished Equipment (GFE).
Computing devices, as defined in 47 CFR 15, shall be certified to comply
with the requirements for Class A computing devices and labeled as set
SECTION 13721A
Page 9