For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control
approval.] [information only. When used, a designation following the "G"
designation identifies the office that will review the submittal for the
Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
a.
b.
c.
supplies and grounding.
e.
Details of surge protection device installation.
f.
Sensor detection patterns.
g. The qualifications of the Manufacturer, Contractor, and
Installer to perform the work specified herein.
Key Control Plan[; G][; G, [_____]]
Key control plan including the following:
a. Procedures that will be used to log and positively control
all keys during installation.
b.
A listing of all keys and where they are used.
c.
A listing of all persons allowed entry to the keys.
Spare Parts
SECTION 13721A
Page 8