equipment as soon as they appear clogged by encapsulant aerosol or pressure
differential drops below 0.02 Hg.
]3.2.7
Air Sampling
**************************************************************************
NOTE: Air sampling regimen is very dependent on
removal method and applicable laws, edit accordingly.
**************************************************************************
**************************************************************************
NOTE: Normal practice is to have the Contractor
hire one independent Private Qualified Person (the
PQP) to perform all required functions. However,
some applicable laws forbid this approach and will
dictate when the PQP, the NC or both will be
required to perform the function involved. However,
the Contractor shall always hire a PQP.
**************************************************************************
Sampling of airborne concentrations of asbestos fibers shall be performed
in accordance with 29 CFR 1926.1101 and as specified herein. Sampling
performed in accordance with 29 CFR 1926.1101 shall be performed by the
PQP. [Sampling performed for environmental and quality control reasons
shall be performed by the [PQP] [NC].] Unless otherwise specified, use
NIOSH Method 7400 for sampling and analysis. Monitoring may be duplicated
by the Government at the discretion of the Contracting Officer. If the air
sampling results obtained by the Government differ from those results
obtained by the Contractor, the Government will determine which results
predominate.
3.2.7.1
Sampling Prior to Asbestos Work
Provide area air sampling and establish the baseline one day prior to the
masking and sealing operations for each [demolition] [removal]
[encapsulation] site. Establish the background by performing area sampling
in similar but uncontaminated sites in the building.
3.2.7.2
Sampling During Asbestos Work
**************************************************************************
NOTE: Choose one of the following options. Normal
practice is to have the Contractor hire one
independent Private Qualified Person (the PQP) to
perform all required functions. However, some
applicable laws forbid this approach and will
dictate when the PQP, the NC or both will be
required to perform the function involved. However,
the Contractor shall always hire a PQP.
**************************************************************************
**************************************************************************
NOTE: When an "enclosed" asbestos control area is
not required, retain the appropriate portion in
brackets.
**************************************************************************
[The PQP shall provide personal and area sampling as indicated in 29 CFR
1926.1101 and governing environmental regulations. In addition, provided
SECTION 13281N
Page 31