to obtain the permits/licenses, delete this entire
paragraph.
**************************************************************************
The Contractor shall certify in writing to the [Regional Office of the EPA]
abatement activities] [_____] [and the Contracting Officer] at least [10]
[_____] days prior to the commencement of work that [_____] licenses,
permits and notifications have been obtained. The Contractor is
responsible for all associated fees or costs incurred in obtaining the
licenses, permits and notifications.
1.9
TRAINING
Training to meet 40 CFR 745 Subpart L requirements shall be provided by an
EPA accredited training provider and the Contractor shall provide proof in
the Qualifications and Organization Report showing that personnel have
passed certification examinations for their respective disciplines, that
fees for certification have been paid to the EPA (or to the state for
state-run programs) and that EPA has certified the supervisor, risk
assessor, workers to perform their duties.
1.10
SAMPLING AND ANALYSIS
**************************************************************************
NOTE: Specify the sampling and analysis necessary
to characterize effectiveness of equipment and
while lead hazard abatement activities are performed
and to assure clearance/cleanup requirements have
been achieved.
Select from the methods below to specify the
sampling and analytical requirements for this
project.
**************************************************************************
1.10.1
Dust Wipe Materials, Sampling and Analysis
Sampling shall conform to [[ASTM E 1728] [ASTM E 1792]].
[Analysis shall
conform to ASTM E 1613 and ASTM E 1644].
1.10.2
Soil Sampling and Analysis
Sampling shall conform to ASTM E 1727.
[Analysis shall conform to ASTM E
1613 and ASTM E 1726].
1.10.3
Clearance Monitoring
**************************************************************************
NOTE: Review 40 CFR 745 (e)(8)(v)(A), (B) and (C)
to determine the quantity and location of clearance
samples for target housing, child occupied
facilities.
**************************************************************************
a.
The Contractor shall take dust wipe samples inside the lead hazard
control area after the final visual inspection in the quantities
and at the locations specified.
SECTION 13281A
Page 9