fire, or where unusual fire hazards cannot be eliminated, flame-resistant
polyethylene sheets which conform to the requirements of NFPA 701 shall be
provided.
1.13.4
Tape and Adhesive Spray
Tape and adhesive shall be capable of sealing joints between polyethylene
sheets and for attachment of polyethylene sheets to adjacent surfaces.
After dry application, tape or adhesive shall retain adhesion when exposed
to wet conditions, including amended water. Tape shall be minimum 50 mm 2
inches wide, industrial strength.
1.13.5
Containers
When used, containers shall be leak-tight and shall be labeled in
accordance with EPA, DOT and OSHA standards.
PART 2
PRODUCTS (NOT APPLICABLE)
PART 3
EXECUTION
3.1
WORK PROCEDURES
The Contractor shall perform work following practices and procedures in
project work plans and the occupant protection plan.
3.1.1
Lead Hazard Control Areas, Equipment and Procedures
The Contractor shall set up lead hazard control areas and operate equipment
within the lead hazard control area in a manner that will minimize
migration of lead dust beyond the lead hazard control area boundaries.
3.1.2
Lead Hazard Control Areas
**************************************************************************
NOTE: The necessary dust control requirements and
lead dust migrations control features of the lead
hazard control area depend on the level of dust
generated by lead hazard control activities and post
lead hazard control building use.
Select containment options below based on guidance
in Tables 8.1, 8.2 and 8.3 in Chapter 8 of the HUD
Guidelines for target housing and child occupied
facilities.
**************************************************************************
Access into lead hazard control areas by the general public shall be
prohibited. Lead hazard control area preparation and restriction
requirements follow:
a.
Containment features for interior lead hazard control projects:
[Polyethylene sheeting sealed with spray adhesive and duct tape]
[Portable plastic partitions] [Colored caution tape] [_____] to
designate the lead hazard control area. The floor in the lead
hazard control area shall be covered with [two] [_____] layers of
polyethylene sheeting. [The entry/exit shall be sealed with a
primitive air lock] [Openings, such as HVAC supply and return air
vents, into the lead hazard control area shall be sealed with
SECTION 13281A