k.
Vinyl Asbestos Tile and Chemical Dissolution of
Asbestos-Containing Adhesives on Concrete Floor System:
See Sheet
59
l.
Vinyl Asbestos Tile Adhered to Wood Floor System by
Asbestos-Containing Adhesive: See Sheet 61
m.
Vinyl Asbestos Tile Adhered to Wood Floor System by Asbestos Free
Adhesive: See Sheet 62
n.
Sheet Flooring Adhered Wood Floor System:
See Sheet 63
o.
Asbestos-Containing Sheet Flooring Adhered to Concrete Floor
System by Asbestos-Containing Adhesive: See Sheet 64
p.
Carpeting (Asbestos-Containing or Contaminated):
See Sheet 65
q.
Miscellaneous Asbestos-Containing Materials:
See Sheet 45
r.
Built-Up Roofing and Flashing:
See Sheet 74
s.
Roof, Shingles and Underlayment:
See Sheet 75
t.
Asbestos Cement Siding:
See Sheet 81
u.
Asbestos Cement Roofing:
See Sheet 82
v.
Asbestos-Containing Walkway Cover:
See Sheet 83
w.
Asbestos-Contaminated Metal Siding:
See Sheet 84
x.
Asbestos Cement Sunscreen Louvers:
See Sheet 85
y.
Electrical Wiring and Fixtures:
See Sheet 95
z.
Asbestos Insulated Electrical Fixture:
See Sheet 96
aa.
Boiler Firebox Insulation: Firebox lining shall be removed from
out-of-service boilers before the boiler is dismantled: See Sheet
97.
3.6.13
Abatement of Asbestos Contaminated Soil
**************************************************************************
NOTE: Soil encapsulation will not be an option in
traffic areas. Remove this subparagraph if it does
not apply. Consult with customer, federal, state,
and local agency for requirements for asbestos
contaminated soil abatement requirements.
**************************************************************************
[Asbestos contaminated soil shall be removed from areas to a minimum depth
of [50] [_____] mm [2] [_____] inches. Soil shall be thoroughly dampened
with amended water and then removed by manual shoveling into labeled
containers. See DETAIL SHEET 73.] [The Contractor has the option to
propose encapsulation of soil instead of removal. Since soil encapsulation
is highly dependent on soil chemistry, available skills for application and
proprietary products, the Contractor shall first test the proposed soil
SECTION 13280A
Page 43