be allowed to saturate material to substrate. Cover jackets shall
be slit at seams, and sections removed and hand-placed in a
polyethylene disposable bag. Exposed surfaces shall be
continuously sprayed with amended water to minimize airborne dust.
Insulation on tanks and boiler breeching shall not be allowed to
drop to the floor. Lagging on piping and insulation on fittings
shall be removed. A penetrating encapsulant shall be sprayed on
all exposed tank, boiler and boiler breeching surfaces.
r.
Troweled Wall Plaster on Studs:
See Sheet 30
s.
Troweled Ceiling or Wall Plaster on Masonry:
See Sheet 31
t.
Acoustical Ceiling on Wall Plaster:
See Sheet 41
u.
Interior Stucco:
See Sheet 78
v.
Exterior Stucco:
See Sheet 80
w.
Pipe and Fitting Insulation (using Glovebag):
See Sheet 86
x.
Storage Tank and Boiler Breeching:
See Sheet 92
y.
Duct Insulation:
See Sheet 100.
3.6.12
Class II Asbestos Work Response Action Detail Sheets
**************************************************************************
NOTE: Remove items in this subparagraph that do not
apply.
**************************************************************************
The following Class II Asbestos Work Response Action Detail Sheet is
specified on Table 1 for each individual work task to be performed:
a.
Light Curtain:
See Sheet 47
b.
Interior Asbestos Cement, Fiberboard and Drywall Panels:
See
Sheet 48
c.
Suspended Asbestos Cement Ceiling Tile:
See Sheet 52
d.
Asbestos Cement Architectural Products:
See Sheet 53
e.
Glued-on Acoustical Ceiling and Wall Tile:
See Sheet 55
f.
Suspended Acoustical Ceiling Tile:
See Sheet 54
g.
Vinyl or Vinyl Asbestos Tile Adhered to Concrete Floor System by
Asbestos-Containing Adhesive: See Sheet 56
h.
Vinyl or Vinyl Asbestos Tile Adhered to Wood Floor System by
Asbestos Containing Adhesive: See Sheet 60
i.
Vinyl Asbestos Tile Adhered to Concrete Floor System by Asbestos
Containing Adhesive: See Sheet 57
j.
Vinyl Asbestos Tile Adhered to Concrete Floor System by Asbestos
Free Adhesive: See Sheet 58
SECTION 13280A
Page 42